Site:
Merrill Lynch, Cheapside EC2
Contracted
to mace Ref: Steve Burrows, Garrett Weir, Jim Trask.
External
Works: Techcrete UK
Carry out all Natural stone
repairs using various methods, each presented with method statements.
Some operations include the use of electrical equipment, (cutting,
spinning, drilling and power washers). All the above works undertaken
are uniformed throughout every external elevation to a high finish.
Some pre cast panels were cladded
with red bricks these needed the above alterations as well as brick
replacements generally due to discolouration damage or problems
incurred during the manufacturing process. As a result interest was
taken to the repointing of various panels to which a method statement
covers each stage.
|

|
|
Spacetek:
Ref/ Peter Bustin
Carried out
various curtain - walling operations. Both internal and external
within the two main glass atriums. Assembly, installations, wet seals
and general engineering specifications undertaken.
|

|
|
Connaught
Cleaning PLC: Ref/ Dave Avears
Having the only
method of access at the moment in time, various cleaning projects were
undertaken i.e. glass, stainless trims, powder coated soft panels,
alloy braces, stonework internal and external finished to high
standards.
|

|
|
T.Clark
PLC: Ref Pat Jackson
Installation of
electrical light enhancement equipment mechanically fixed to steel
supports within an expansive glass atrium, with operational office
area below.
|

|
|
Swift
Horseman: Ref Bob Sunnit/ Martin Voller
Cleaning projects undertaken, to
remove render from coping panels and other fittings. Install silicon
sealants of various colours, tooled to agreed finishes. Install two
meter lengths of powder coated capping panels throughout the South
atrium.
|

|
|
Atlantic
House, Farringdon Road, EC2
Contracted to Skanska Ref/ Roman Kirbybuk, Lee Stacey & Asgar
Chouglay
In coordination with Benwall Fixing Company Ref/ Sam, Ian, Chris
& Steve
Curtain Walling installation,
replacement and remedial work undertaken using specialist access. With
a constant liaison with Skanska and Benwall we combined skills and
experience to address and overcome various problems throughout the
building. Relevant method statements prided by G.T.ROPE ACCESS Ltd
supported all operations undertaken.
Using a team of abseil operatives
equipped with two way radios and digital cameras we successfully
carried out a process of de-glazing and glazing safely and efficiently
without the use of a house cradle. With the use of a mobile cannon,
seated on the house cradle track we attached a block and tackle,
hooked onto a rechargeable power sucker, which enabled units to be
raised and lowered, glazed or de-glazed. Banking and rope management
skills ensured high and low level safety during all operations. This
procedure enabled the glazing program to regain its target within a
four-day period.
Various sealant modifications
were introduced and installed throughout the building, such as
glass-to-glass units, horizontal and vertical joints to be tooled
flush, not recessed as fitted. Part of our remedial package was to cut
out meters of sealant and conpreband, then reinstall as instructed.
During all sealant operations, sheets of cordex protection were used
on all stonework, low-level canopies, paving stones and terrace flagstones then disposed of. With combined efforts from Benwalls,
Skanska, Mace, and G.T.ROPE ACCESS Ltd, Atlantic House is without any
further weathering problems!
|
Benwall
Fixing Co Ltd |
|
Faber
Blinds : Chris Cosford / Chris Foley
E.A.G
Sealents / Northampton
Install Corking and Sealants to internal glass atrium and
commission all existing applications.
Install
and commission electric blinds within a glass atrium. Drill tap and
fix to steel overhead box section steel using electrical tools and
equipment.
|

|
|
Stuart
Brown Partnership / Lovells / Gemma Chamen
Dismantle and remove non
commission electric blinds from horizontal glass roof.
|

|
|
Gormley
Marble Specialists / Paul Keenan
Carry out snagging as instructed
on seven, thirty meter granite columns. Location Triton Square.
|
Gormley
Marble Specialists Ltd

|
|
Mace
/ Geff Charlotte
Dismantle and de-rig
internal (façade hoist ) house Cradle using industrial rope access
equipment.
|

|
|
Benwall
Fixings/ Barry Bennet/ Portugal Street WC2
Install
external facade panels using rope access and various rigging
techniques.
All
work catalogued on digital imaging equipment, and emailed as
requested.
|
Benwall
Fixing Co Ltd |
|
Stuart
Brown Partnership / Lovells/ Alan Clarke
Contract Glass Cleaning, Sealant
Applications, Snag and Repair Armour coated plaster.
|

|
|
Ellmer
Construction
Assist in Rigging
and transporting heavy duty lifting equipment to and from various
levels within a 50 meter high glass atrium.
|

|
|
Atlantic
House EC2
Armour Coated
Plaster LTD - Commission polished Plaster in main entrance of lovells
main building using industrial Rope Access.
|

|
|
Phoenix
Electricals/ Phil Nelson
Carry out maintenance repairs and
commission internal & external lighting equipment.
|

|
Angela
Conner / Fellow of the Royal Society of British Sculptors
Over a period of six months, our
team work has made it possible to install Europe's tallest indoor
water themed sculpture at Lovells in London.
GT has had a high level of
involvement to all planning, organization and operations undertaken to
this package:
-
Extensive Rigging
-
Lifting of equipment
& materials using pulley systems.
-
Installing house cradles
for welding equipment and operatives.
-
Load Testing each part of
the sculpture as it is erected using lead weights and recording each
alteration made.
-
Carry out cutting,
grinding and fabrication welding.
-
Using tools &
equipment and assemble all fittings and components.
All the above works were
completed using Industrial Rope Access.
|
Royal
British Society of Sculptors |
Ministry
Of Defense Buildings / Richard Belamy / Mike Stride / Phil Cooper
Skanska
Rashliegh Weatherfoil Ltd/ Electrical & Mechanical Engineering
Carry out various maintenance
projects to the following buildings:
Operations involved:
-
Pest control /
Installation of netting and removal of pest waste
-
All repairs, maintenance
and clearance to pitched roofs, flashing and guttering
All inspections are documented with Digital
Enhancement Equipment.
|

|
|
ST Giles
Court
ST Giles Circus
WC2 & LD
-
Remedial works to
external window units
-
Carry out reinforcement
with stabilizer to each window unit and remove all instable
concrete, brickwork and rebar
-
Patch repair and apply
slurry coating uniform throughout
-
Remove corroded rebar /
core drill / stainless dowels and chem-fix various areas
-
A complete photographic
data report and elevation drawings supplied on completion
-
A 3 Month Project
|

|
|
JOSEF
GARTNER AND CO LTD
Jamie Ross, David Morgan.
London
E14
9UB
-
Tower
Place, Tower Hill London EC3
-
Create
Access and install specific panels of stone to levels 1-5 around
Waagner Biro Cables
Penetration
on East Building. Fit external facade trims and Bree-Soleils as
instructed By Jamie Ross. Install Hauling systems all supported by
method statement and risk assessments.
|

|
|
Skanska
UK Build
Contract: Roman Kirycuk
Swiss Re / Baltic Exchange Redevelopment
ST Mary's Axe
London EC2
-
Swift
Horsman / Dave Kelly
-
Lightweight
Plastering / Ron Meadwell
-
Install
various Rope Systems within two riser shafts from levels 36 to 1
using Irata Confined Space Guidelines
Scope
of Work
Installation of Rockwool and fire retardant sealant products to internal
service hatches
Carry out numerous dry walling repairs and commission all internal
installations
|

|
|
Pearce
Group LTD
Contact: Paul Dean, David Mortimer
Travel INN
Pearce Leisure
Royal Victoria Dock
London E16 2BU
|

|
|
Haymills
Contractors
Contact: JOE Breckon
Science Museum
Queensgate
London SW7
All areas smoke tested to 0.9 Pascals / m2
|

|
|
Skanska
UK Build
Swiss Re
St Mary's Axe
London
EC2
Baltic
Exchange Redevelopment.
Contact: Asgar Chouglay
Create
Access in each set of six pack atrium areas situated on levels 4-10,
15-21 and 22-27, plus various two story atria around the building.
Install three types of stainless steel bolt-on and clip assembly fixings
to atrea beams and bow tie levels. Each fixing to be installed as
instructed by street crane express
A total of 1700 components to be fitted as part Program to install an
Internal mobile access rigging system over a 5 week period.
|


|
|
AWS
Commercial windows limited
Contact
Robin Depper
Bryer Group Plc
Contact: Carl Abrahams and Jamie Ross
Winter Garden House
Mackin Street
London WC2
Create
roof top access and carry out removal of various glazed sash units.
Commission reinstall, and install various sealant applications
|

|
|
Fireclad
Limited
Contact
David Flynn and Paul Mc-Quin
Time Square Project
Blackfriars
Queen Victoria Street
EC4
Mace
Project . Reference
Steve Burrows
Install various rigging and haulage systems in four dry riser
shafts, each 7 levels high with door opening on each level. Mechanically
fit, brackets, steel lanyards and adjustable solid weight systems to
ensure doors remain closed throughout extensive fire testing.
|

|
|
Skanska
Build UK
Swiss
Re
St Marys Axe
EC2
Contact
Asgar Chouglay and Decklan Gormley
Create
access to 24 static portable cabins stacked four high. Install a master
system fishing eye bolts each linked with kermantle ropes providing a
working perimeter safety line. Using various spanners, sockets and
wrenches remove all bolts, brackets and side panels to each cabin. Sling
removed materials on lower to ground level using pulley system and GT
Banksmen
|

|
|
Hindwoods
Hunter Payne Limited, Chartered Surveyor
Syndenham
High Street
Contact Chris Withersgreen and Richard Bellamy
Carry out monumental stone restoration, re-pointing, brick
replacements, acid cleaning, water proof render applications and various
guttering modifications.
Restore concrete moldings and terracotta detail.
|

|
|
Skanska
Build UK
Swiss Re Building 30 St Mary Axe London EC1
Manager Asgar Chouglay
-
An
abseil project requiring a team of five technicians for a four month
period
-
Project
supervised by Health and Safety Executive Toney Northcott
-
Three
day in house inspection of equipment, certifications, textile
testing records, company liability insurance policies, IRATA
certifications, method statements, risk assessments, cosh reports,
company registered certifications and a full environmental
registration documents approved by LOLER, IRATA and Skanska all
provided at a high standard by GT Rope Access Limited
-
Task
/ Install two piece, custom made, stainless steel rope access anchor
points to each internal atria bow tie and dog leg attachment point
throughout every one – six fingers within two pack and six pack
atria levels uniformed from level one to thirty eight
-
Access
created from OCS trolley track systems and advanced rigging
-
Rescue,
access, and haulage systems created daily to ensure safety and
provide a professional service working at a methodical rate
-
Components
installed were tagged as installation requirements
|

|
|
Skanska
Build UK
Swiss Re Building
Asgar Chouglay Ian Perry
Sandbergs Engineering James Kern Tony Pitman
-
A rope access project
requiring a team of five technicians for a five month period
-
Carry out load testing to
each and every abseil attachment anchor point listed above and to
include all side traversing trolley rail systems built into each two
pack and six pack upper floor
-
Lifting equipment
consisting of turfors, long chain block and tackles, shackles,
material slings, pallet trucks and custom made parapet lifting and
access platforms
-
Sandbergs Engineering
responsible for supervising and monitoring the testing
|
|
|
Benwall
Fixings Ltd Charter House,
Faringdon Rd, London
Barry Bennett
|
Benwall
Fixing Co Ltd |
|
JOSEF
GARTNER AND CO LTD
Tower Place, London
Jaimie Ross, David Morgan
|

|
|
UBS
Warburgs
Finsbury Avenue London EC2
Brian Scott
|

|
|
Lightweight
Plastering
Swiss Re Building
30 St Mary Axe
Tom Burke
|

|
|
Haymills
Contractors Ltd
Shaun Bongard
Science
Museum, Southgate,
W7
-
Carry
out sealant applications and mortar pointing, air testing
-
General
making good of external stonework by rope access
|

|
|
Pearce
Leisure PLC
Greg Lake
Travelodge,
Excel East, Victoria Dock, London E16
|

|
|
Lovell’s
/ Stuart Brown
Alan Clarke
|
|
|
Skanska
Build UK
Roman Kirycuk
Swiss Re Building
Swift Horsman
Jim McLelland
Lightweight Plastering
Ron Meadwell
-
Confined spaces within
central riser shafts from ground – level 37 by rope access
-
Install sealants to
access hatches at each floor level
-
Provide follow-up
photographic inspection
|

|
|
AWS
Ltd
Robin Depper
Winter
Garden, London WC2
-
Carry
out inspection of rooftop anchor point
-
Carry
out removal of various sash windows then replace with double glazed
window units
-
Install
external sealant applications then apply external UPVC glazing
strips
|
|
|
Fireclad
David Flynn
Time
Square Project, Queen Victoria St,
Blackfriars, London EC4
|

|
|
Swiss Re
Building
Skanska Build UK
Declan Gormley
|

|
|
Swiss Re
Building
Schmidlin UK
Ian Gurney
-
Access 2 pack and 6 pack
atria using OCS person rider system
-
Install M10 tapped bolts
and sprung washers and torque set each one
-
System tested and
certified
|

|
|
Skanska
Rashleigh Weatherfoil Ltd Electrical and Mechanical Engineering
M.O.D. Building, No 1 Old War Office, Whitehall SW1
|

|
|
Skanska
Rashleigh Weatherfoil Ltd
Northumberland House, London, WC1
Mike Stride
|

|
|
Swiss Re
Building
Asgar Chouglay
|

|
|
Fireclad
Ltd
Mark Skinner
Mace Projects
Steve Burrows
RBS, London EC1
|


|
|
Swiss Re
Building
Skanska Build UK
Paul Thorogood
-
Carry out re-testing to
dog leg suspension points and bow tie plates using 4 x 250kg weights
-
Create hauling system to
lift testing equipment into position in atria
-
Testing certificated by
Sandbergs Engineering
|

|
|
Swiss Re
Building
London Engineering Ltd
Pat Curran
|
|
|
Swiss Re
Building
Skanska Build UK
Roman Kirycuk
|

|
|
Skanska
Build UK
Asgar Chougly
Bury St Building, London EC3
|

|
|
Swiss Re
Building
Skanska Rashleigh Weatherfoil
Paul Peck
|

|
|
Skanska
Build UK
Paul Thorogood
Valliant House London EC3
|

|
|
Laxcon
Construction Ltd
Sam Assani
Penthouse Apartments, Whitechapel London EC2
|

|
|
AESA
UK Ltd
Access Cradles Ltd
Gerald Gartner
Radisson SAS Hotel, Stanstead Airport
|

|
|
Stonewest
Ltd
Steve Warren
Marriot Hotel, London W1
|
 |
|
Skanska
UK Build
Paul Thorogood
Valliant House EC3
|

|
|
Skanska
Build UK
Ian Perry, Kevin O’Shea, Gary Lucas
Radisson SAS Hotel, Stansted Airport
-
Using internal atria
person rider system to redecorate high level steelwork
-
Carry out lighting
installations for Peter Ronsford, Peter Burns and Bill Darling
|

|
|
Tubular
Erectors Ltd
Radisson SAS Hotel
Andy Scott
-
Supply five person rope
access team to remove corrosion and spot welds from front screen
steelwork, ground – level 4
-
Carry out preparation for
and application of three coats of white cellulose paint
-
Apply sealant
applications to armour coated internal render
|

|
|
Swiss
Re Building
Coflex
ISS Facilities Services Ltd
Angelyn Balleza
|

|
|
AESA
Ltd
Access Cradles
Gerald Gartner
Radisson
SAS Hotel, Stansted Airport
|

|
|
Radisson
SAS Hotel,
Stansted Airport
Jim Bailey
|

|
|
Gratte
Brothers Ltd
Warren Bradshaw
Radisson SAS Hotel,
Stansted Airport
|

|
|
Gormley
Masonry Services Ltd
London NW10
Ken Pine
Lion Plaza
White and Case Building
Old Broad Street EC1
Works undertaken within a
fully occupied forty meter internal atria
Using rope access and
experienced masonry technicians install all hard pointing stone to
stone and sealant applications stone to steel work
Work completed in time for
clients Christmas party 2004
|
Gormley
Marble Specialists Ltd

|
|
Jones
Lang LaSalle
Marcus Cain
London EC2
Regular
Cleaning Services Limited
Barry Herbet
London SE 13
Lion Plaza
Old Broad Street
London EC1
-
Build
clean project within a fully occupied internal atria
-
Working
along side Amex building management and Fujitec lift engineers to
carryout a program of access without disruption to building
occupants and there clients
-
Access
created from the installation of three pairs of elephant trolley
plates fitted to house cradle perimeter eye beam track by GT Rope
Access Ltd
-
Project
included maintained to high level louvers / bre solays, vacuum
hovering all recessed integral grid designed perimeter steel work
using back pack pneumatic hoovers, snagging of sealant applications,
cleaning of glass lift cars, perimeter glass, balustrades, stone
work, steels, lighting units, lift pits and internal glass canopy
all accessed using rope access skills
-
A
regular maintained contract 2004 onwards
|

|
|
White
and Case
Carla Winchester
Lion Plaza
Old Broad Street
London EC1
|

|
|
Humbro
Roofing Limited
London EC3
Steven Humbro
Lloyds Register Building London
Gwy Williams
|
|
|
Schmidlin
UK
Ian Cameron
Skanska UK
Peter Pontsford
Coflex
Ritchard Stead
Robin Dinmore
Swiss Re Building Gherkin April 2005
-
A bottom hung triangular
unit of glass fell 120 meters (400 feet) to the ground plaza without
injuring any persons GT Rope Access Ltd was requested to supply a
ten person team of rope technicians stabilize window units as
instructed by Schmidlin
-
All involved carried out
the project in a professional manner avoiding press and reporters
and not commenting to tabloid papers throughout the incident.
-
The project required the
removal of left and right handed electrical motors powering the
opening and closing of all bottom hung window units installed in
each two pack and six pack location throughout the building
-
Motors were examined
tagged and parceled for shipping back to the manufacturers for
commissioning / redesign.
-
Motor units were later
returned and installed by Schmidlin UK
-
Following our project
completion the GT team were commended for our efforts and rewarded
with drinks and canopies courtesy Coflex management
|

|
|
Hindwoods
Hunter Payne (Chartered surveyors)
Colin Elliot
Dulwich High Street
SE London
-
Install cable ways and b
lay rope systems to access a lightning damaged spire and steeple
situated on a slatted roof
-
Remove damaged turret
complete, rebuild to as specified
-
Carryout led work and
roofing repair
-
Commission lighting
conductor cables and brackets
|

|
|
Skanska UK
Build
Palestra Building
Southwark
SE London
Gary Clifford (Project Director)
-
Industrial window
cleaning project
-
Use
roof level overhead structural steelwork to multi-
-
Use rope access on three
complete elevations to complete build clean
-
Policed
|

|
|
Skanska UK
Build
Radisson SAS Hotel
Stansted Airport
William Brock (Project Director)
Martin Harris (Senior Suveyor)
-
Redecoration project
using rope access
-
Using ICI specialist
paint products, re-paint a prestigious centre piece lift core
positioned in the main entrance internal atria
-
All applications to be
uniformed
-
Added protection to white
marble floors and precautions whilst working within a occupied
environment
|

|
|
R
& S Fire and Security Limited
John Allsop / Duncan Ross
Mace Solutions Limited
Geof Charlotte / Simon Hudson
British Airways Project
Terminal 5
Heathrow Airport
Project Location & Task
Fire
Sealing the Compartment Wall between the Goods Hoists and the Fire mans
Lift
Fireman’s Lift Shafts: L100 L97 L90 L89 L85
L83.
Goods Lift Shafts: L98 L96 L91L88 L84 L82.
GT Rope Access Limited will be a sub contractor
to R & S Fire & Security.
Provide two industrial rope access teams each consisting of five IRATA
registered operatives each equip with full PPE, equipment and knowledge
of project.
An IRATA level 3 operative shall work in each team to ensure maximum
safety and productivity.
Each working pair shall be policed at all times by a multifunctional
third team member.
This team configuration provides a project liaison representative
responsible for keeping the project on program and problem solving till
completion.
An on site policeman ensures the entire work zone is safe and protects
all other working operatives along with preparation of all tools,
materials and equipment daily.
Two operatives constantly working from ropes,
third rigging, de-rigging, attaching materials, tools, equipment, to
working ropes on all levels to maintain productivity.
IRATA ID membership cards and company multimedia
profile package will be presented before project commences.
All access equipment, skill cards, and GT
insurances to be supplied by GT ROPE ACCESS LTD prior project
commencement.
In addition all drawings, monitored progress
sheets and priority progress reports shall be collated and supplied on
completion.
The entire project
GT0101 will be photographed and stored on disc for client viewing.
Following our meeting on site with Geoff
Charlotte of Mace Solutions Tuesday 3rd August 2005 GT provides
alternative access solutions.
GT0101 project shall be undertaken without any
ground level disruption, resulting in zero client/building
inconvenience.
As agreed this project can only be undertaken
during weekdays between the hours of 6am to 6pm.
Installation works to be carried out at a
methodical pace whilst handling new materials and power tools,
productivity to increase following resourceful problem solving and
experience gained.
Create access within two lift shafts each day,
(ropes to be deviated to provide optimal work positioning) use
electrical tools provided by RNS for example:
-
Side winder drills
-
Dry wall screw guns
-
Tek guns (A HILTI DX
ticket required to operate this equipment)
-
Shot fire fixing guns
-
All power tools sourced
by 110 volts and certificated
-
Reciprocating
saw
-
Grinders and cutting
tools (hot works certificates and permits supplied)
Task lighting and Harris fencing to be installed
and customised by a Mace Solutions labour team daily.
Materials chosen to be installed are:
-
Expanding foam
-
Corking and sealants
-
Hessian/Normex material fire retardant
blanket
-
Reeled fine metal sewing cable (to stitch and
secure blanket material)
-
Screws, brackets, angle trims etc
Install fire retardant products to a total of 12
lift shafts using industrial rope access.
All products used shall have supporting data sheets.
Coshh report will be attached to Risk Assessment and Method statement.
Communication during the project is possible using 2 way radio systems.
Industrial rope haulage systems shall be created and installed to rise
and lower materials and equipment when operative is in a working
position.
Protection to all finished surfaces must be installed prior to access
and blue shoe covers to be worn if requested.
All tools used shall be fastened to the working harness via lanyards.
Exclusion zones shall be installed using hazard signs, Harris fencing
and scope of work notices supplied by GT.
GT will contribute skills, equipment and experience to ensure the
project is completed safely and efficiently.
Method statement & risk assessment supplied by GT Rope Access
Limited.
A complete photographic data report can be
provided on completion or each phase.
|


|
|
Omega
Red Group Limited
Patrick Fairman QS
Travel Lodge Hotel
116 High Holborn
Paul Icessan Project Manager
West London
Installation
of insulated alloy lightning cable track on various vertical elevations
Where necessary fit cross over plates and earth tags
Visually inspect latch way system
Build roof rigs and back up access systems to concrete structural
columns
Provide advanced deviation systems and rope protection
Project completed thanks to Martin the steeple jack / experienced IRATA
qualified rope access technician
|

|
|
PIP
Electrics Limited
Jim
Ward / Bob Moore
Fenton
House
Southfields
Business
Park
Basildon
Essex
SS15
6TD
United
Kingdom
Broadgate
West
Building
Phase 2
1
Snowdon Street
London
EC2A
2AP
United
Kingdom
To
dismantle louver unit rotate 180 degrees and re install using tools
supplied and rope access multiple rigging points backed up to structural
anchor points tested at 20 tons, providing precise rope access working
positioning.
-
Ensure
equipment is inspected and installed correctly.
-
Provide
a safe policed working zone
-
Carryout
the task at a methodical pace with full knowledge of risk and task.
Industrial
rope haulage systems were created and installed to raise and lower
materials and equipment when the abseil technician is in a working
position.
GT
shall supply all certifications and insurances on request.
All
tools used shall be fastened to the working harness via lanyards.
Ground
level zones shall be policed during any access operation.
On
request exclusion zones shall be installed using hazard signs, warning
tape and scope of work notices supplied by GT.
|

|
|
Gerald
Gardner (General Manager)
AESA
UK Limited
104
Maltings Place
169
Tower Bridge Road
London
SE1
3LJ
Radissons
SAS
Hotel
London
Airport
Waltham
Close
Stansted
Airport
Essex
CM24
1PP
United
Kingdom
Carryout
a visual and textile examination to all bolted attachment points fitted
to the perimeter person rider bracket plates. Fit Nyloc nuts where
necessary using a ratchet spanner, tighten each spacer nut to all
relevant basketry.
With
the above works completed the continuity of the rider system
fabrications will ensure a noticeable reduction in deflection /
movement.
Inside
the wine tower load test the four motorised trapezes systems using 5 x
25 kg weights and 35kg tray, total 160kg tests, each test was monitored
from within the tower cap and from ground level.
GT
recommend a metallurgist engineer (SANDBERGS) examine the fabrication of
the person rider system if deflection continues.
Haulage
systems shall be installed and all material objects raised and lowered
using tailored slings.
|

|
|
Patrick
Fairman / Chris Hopson
Omega
Red Group Limited
Unit
10 Prospect Way
Hutton
Industrial Estate
Brentwood
Essex
CM13
1XA
Kings
College
London
WC2
2HH
Set
up advanced rigging systems for GT technicians and Omega personnel.
Install
lightning tapes as advised by Omega Supervisor David Reed.
Assist
in daily progress meetings with Craig Eccleston of Meica, Paul Whip and
Rodger Johnston of Bovis daily.
|

|
|
Tim
Cordon (General Manager)
Simon
Pearson (Chief Engineer)
Radisson
SAS Hotel
London
Stansted
Airport
Waltham
Cross
Essex
CM24
IPP
United
Kingdom
Radissons
SAS
Hotel
London
Stansted
Airport
Waltham
Close
Essex
CM24
1PP
To
create access to internal atria roof top tracking system (rail and
roller plates to be tagged and certificated prior to project
commencement ) from level 4 link bridge using industrial rope access
methods.
Use
trolley rail to traverse into suitable working positions, any further
rigging will require 2 separate structural points of attachment.
-
Clean
internal glass of wine tower.
-
Remove
each high level ventilation grill and vacuum internal filter and
visible grills uniform throughout atria.
-
Vacuum
all steelwork and ledges accessible from the internal person rider
system.
-
On
request commission all internal atria lighting systems.
-
In
the case of an urgent requirement for abseil access GT Rope Access
Limited will guarantee a same day response.
Industrial
rope haulage systems shall be created and installed to raise and lower
materials and equipment when the abseil technician is in a working
position.
Protection
to all finished surfaces must be installed prior to project commencement
and blue shoe covers to be worn at all times to prevent damage to
painted surfaces.
|

|
|
Schneider
(GB) Ltd
49
Wilkins House
Churchill
Gardens
London
SW1V
3BY
Schneider
(GB)
Stratford Eye Project
Wates C.L
Oxford
Road
Stratford
London
E15 1BJ
Set
up advanced rigging systems to concrete pillars situated above each
working location on zones A and K.
Install
horizontal gaskets and retaining clips on units at Grid T3/A and
Grid T3/K.
Survey gasket at base of units and take photographic evidence to show
correct seating of gasket from ground level to level 14.
This procedure will repeat on all levels.
|

|
|
Craig
Blake
Skanska
Facilities Services
Room
91.1.04
M.O.D.
Head Office
Whitehall
London
SW1A
2EU
M.O.D.
Main Building
Whitehall
SW1A
2EU
Remove
debris / foliage from each gulley opening, remove stones on zones B D F
I K M carryout a visual and textile examination of the surface membrane
identify any damage and carryout appropriate repairs.
All
tools and materials will be placed in GT lock neck material pod bags
whilst working at heights.
To
maximize on productivity and minimize on any disruption to clients the
entire project will be policed at all times by each IRATA trained
technician.
|

|
|
Tim
Cordon (General Manager)
Simon
Pearson (Chief Engineer)
Radisson
SAS Hotel
London
Stansted
Airport
Waltham
Cross
Essex
CM24
IPP
United
Kingdom
To
create access from external roof top level using two alloy
roof rigg kits backed up to latch way anchorage system.
All
equipment is lightweight and transportable. Each rigg shall be assembled
on a sheet of protective material and marine plywood to protect roof
surface.
A
demonstration of the use of the equipment and sample of the high quality
clean was displayed on two elevations Wednesday 11th October
2006 to John Lassaso and Simon Pearson, a bench mark standard to be
uniformed on each elevation.
Three
rope technicians and two abseil roof riggs shall target fourteen drops
per working day, each drop approximately 1.8 metre wide reach.
Industrial
rope haulage systems shall be created and installed to raise and lower
materials and equipment when the abseil technician is in a working
position.
Protection
to all finished surfaces must be installed prior to project commencement
and blue shoe covers to be worn at all times to prevent damage to
painted surfaces.
A
complete photographic data report can be provided on completion.
|

|
|
Craig
Blake / Babara Baynes
Skanska
Facilities Services
Room
91.1.04
M.O.D.
Head Office
Whitehall
London
SW1A
2EU
UK
M.O.D.
Main Building
10
Horsgards Avenue.
Ensure each technician
is constantly attached to the certificated Sala latch way system or
certificated anchor bolts installed. Rigg a set of low stretch working
rope to allow a technician to descend to the building edge drain pipes.
Remove
debris / foliage from gulley openings and drainage systems and carryout
appropriate repairs if required.
GT
will contribute skills, equipment and experience to ensure the project
is completed safely and efficiently.
|

|
|
Graham
Handley (Project Manager)
AESA
UK Limited
104
Maltings Place
169
Tower Bridge Road
London
SE1
3LJ
Radissons
SAS
Hotel
London
Airport
Waltham
Close
Stansted
Airport
Essex
CM24
1PP
United
Kingdom
Naracon
Monorail Internal Trolley System
Using
industrial rope access equipment and advanced rigging systems connect a
GT operative to the internal perimeter person rider trolley rail.
Throughout
the project a second GT operative shall police ground level if requested
install
cordons and signage.
Carryout
a visual and textile examination to each bolted attachment point to
perimeter person rider bracket plate system installed. With works
carried out 2006 the continuity of the rider system fabrications has
shown a noticeable reduction in deflection.
Load
test carried out to 190KG with 150KG weights, 35KG basket and 6KG block
tackle.
System
satisfactory, read advisory notes made on GT0112 and GT0118 documents.
Naraco
External Box Ladder System
Loaded
system with a distributed total weight of 330KG.
The
low level buffer rail requires remedial repairs in six allocated areas;
unfortunately due to adverse weather conditions these works remain
incomplete.
NOTE
GT
advised that an internal collar be fitted between each unsupported
buffer rail end using a drill and pot rivet method. The above mechanical
fixing will ensure the system maintains its continuity and prevent any
further distortion damage.
All
works carried out at a methodical pace in awareness of person safety.
|

|
|
Charles
Cooper
Eye
Pro Limited
Hollywood
House
76
Hollywood Lane
Rochester
Kent
ME3
8AR
Weymouth
Court,
Weymouth
Street,
London
W1
Set
up advanced rigging and pulley systems for GT technicians.
Carryout
installation of 72 chimney cowlings as instructed by IPRO supervisor.
Supply
IPRO with digital images on project completion.
All
tools and materials will be placed in GT lock neck material pod bags
whilst working at heights.
To
maximize on productivity and minimize on any disruption to clients the
entire project will be policed at all times by each IRATA trained
technician.
Exclusion
zones can be installed on request, using hazard signage and warning
tape.
|

|
|
Paul
Flynn
N.D.M
Limited
Lead
Sheet Specialists
Metallum
House
3
Innovation Park
Manor
Farm Road
Alperton
Wembley
Middlesex
HA0
1XE
Kings
College
London
WC2
2HH
Facing
Thames
River
Set
up advanced rigging systems for GT technicians.
Carryout
lead work repairs in two locations as advised by N.D.M Supervisor.
Supply
Bovis with digital images on project completion.
All
tools and materials will be placed in GT lock neck material pod bags
whilst working at heights.
|

|
|
Craig
Blake
Skanska
Facilities Services
Room
91.1.04
M.O.D.
Head Office
Whitehall
London
SW1A
2EU
UK
M.O.D.
Old War Office
Horseguards
Avenue
Whitehall
London
SW1A
2EU
Roof
top-level, light well East side.
Remove
existing debris netting from cargo mesh and separate carefully from
rigged metal cabling. Waste mesh to be bagged and disposed of by GT Rope
Access Limited.
All
tools and materials will be placed in GT lock neck material pod bags
whilst working at heights.
GT
expects there to be various dates and events on the British calendar
which may result in you the client providing a flexible program of works
throughout this task.
|

|
|
James
Powell (Project Engineer)
Dawn
Wootton (Accounts)
Imperial
Ductwork Services Limited
Marlowe
House
Ground
Floor Suite
109
Station Road
Sidcup
Kent
DA15
7ET
Mace
Project
Beddington Farm Road
Croydon
London
To
access rigging areas using scissor lift, connect to latch way systems.
Set
up advanced rigging and pulley systems for GT technicians.
Carryout
assembly of duct units and install as instructed by I.D.S. L Supervisor.
Supply
Mace with digital images on project completion.
All
tools and materials will be placed in GT lock neck material pod bags
whilst working at heights.
To
maximize on productivity and minimize on any disruption to clients the
entire project will be policed at all times by each IRATA trained
technician.
|
Imperial
Ductwork
Services Limited
|
|
Patrick
Fairman
Omega
Red Group Ltd
Dabell
Avenue
Blenheim
Industrial Estate
Bulwell
Nottingham
NG6
8WA
UK
Kings
College
London
WC2
2HH
End
elevation / facing
Thames
River
To
access rigging areas using internal passenger lifts and external stair
well.
Set
up advanced rigging systems for GT technicians.
Carryout
the removal and re-installation of two metal cowlings.
Supply
Meica, Bovis and Alan Gibbs (Kings College) with digital images on
project completion.
|

|
|
James
Ballie Director Technical Development
Park
Hotels Management Limited
Chicago
Avenue
Manchester
M90
3RA
United
Kingdom
Park
Inn Hotel
St
Mary’s Street Bedford
Bedfordshire
MK42
0AR
Front
Elevation Rear Elevation Duck Mill Lane
Elevation and
Riverside
Elevation.
To
access above areas using internal passenger lifts and stair wells.
Install
mobile alloy roof rigs and back up each to structural points.
Carryout
a hammer test to each concrete panel on all elevations removing any
loose concrete (all tools and materials are placed in GT lock neck
material pod bags whilst working at heights) and collate material
findings.
Drill
sample tests and phenolphthalein tests have been undertaken and results
are catalogued in the survey report.
A
bound copy of the survey report has been posted to James Baillie at 79
Ravelston
Dykes Road
Edinburgh
EH4 3NU
.
Included
in the survey report package is a memory key containing a PDF format of
the photographic report and a word document folder containing helpful
information to assist in summarising the current building condition.
To
maximize on productivity and minimize on any disruption to clients the
entire project has been policed at all times by each IRATA trained
technician.
GT
has contributed skills, equipment and experience to ensure this project
has been completed safely and efficiently.
Method
statement & risk assessment supplied by GT Rope Access Limited.
|

|
|
Craig
Blake / Barbara Baynes
Skanska
Facilities Services
M.O.D.
Head Office
Whitehall
London
SW1A
2EU
M.O.D.
Main Building
Whitehall
SW1A
2EU
Ensure each technician
is constantly attached to a certificated Sala latch way system,
certificated anchor bolts or ensure a safe connection from the working
harness lanyard. Once in the work zone rigg a friction pulley system
attached to overhead structural steel work using plastic coated bomb
proof steel strops.
Using
material slings connect to air conditioning compressor unit, lift and
lower to ground level, repeat procedure and ascend replacement unit to
level five installation points.
Ensures
compressor unit does not invert, keep upright.
All
tools and materials will be placed in GT lock neck material pod bags
whilst working at heights.
|

|
|
Craig
Blake / Barbara Baynes
Skanska
Facilities Services
M.O.D.
Head Office
Whitehall
London
SW1A
2EU
M.O.D.
Main Building
Whitehall
SW1A
2EU
Ensure each technician
is constantly attached to a certificated Sala latch way system whilst
rigging to eye beams, install rope protectors where necessary.
Remove
caps and gulley filters, clear all debris and foliage from drain system
and carryout water test. Document results in a follow up report.
All
tools and materials will be placed in GT lock neck material pod bags
whilst working at heights.
|

|
|
Tim
Cordon (General Manager)
Simon
Pearson (Chief Engineer)
Radisson
SAS Hotel
London
Stansted
Airport
Waltham
Cross
Essex
CM24
IPP
United
Kingdom
Radissons
SAS
Hotel
London
Stansted
Airport
Waltham
Close
Essex
CM24
1PP
United
Kingdom
To
create access to internal atria roof top tracking system (rail and
roller plates to be tagged and certificated prior to project
commencement ) from level 4 link bridge using industrial rope access
methods.
Use
trolley rail to traverse into suitable working positions, any further
rigging will require 2 separate structural points of attachment.
-
Clean
internal glass of wine tower.
-
Remove
each high level ventilation grill and vacuum internal filter and
visible grills uniform throughout atria.
-
Vacuum
all steelwork and ledges accessible from the internal person rider
system.
-
On
request commission all internal atria lighting systems.
-
In
the case of an urgent requirement for abseil access GT Rope Access
Limited will guarantee a same day response.
Industrial
rope haulage systems shall be created and installed to raise and lower
materials and equipment when the abseil technician is in a working
position.
Protection
to all finished surfaces must be installed prior to project commencement
and blue shoe covers to be worn at all times to prevent damage to
painted surfaces.
GT
shall supply all certifications and insurances on request.
All
tools used shall be fastened to the working harness via lanyards.
Ground
level zones shall be policed during any access operation.
On
request exclusion zones shall be installed using hazard signs, warning
tape and scope of work notices supplied by GT.
|

|
|
Charles
Cooper
Eye
Pro Limited
Hollywood
House
76
Hollywood Lane
Rochester
Kent
ME3
8AR
Weymouth
Court,
Weymouth
Street
,
London
W1
To
access rigging areas using internal stairwell and loft opening. Connect
to latch way systems before accessing roof top.
Set
up advanced rigging and pulley systems for GT technicians.
Working
with IPRO rig working ropes to elevation 4.
Carryout
refurbishment works to level one cornis using rope access and a portable
mobile tower.
Hammer
test the rendered underside, remove any loose debris, expose steel work
and grind back to clean metal, apply a suitable zinc paint product and
uniform stone repairs using Portland repair mix.
Supply
IPRO with digital images and progress reports throughout the project.
All
tools and materials will be placed in GT lock neck material pod bags
whilst working at heights.
Method
statement & risk assessment supplied by GT Rope Access Limited.
|

|
|
Craig
Blake / Barbara Baynes / Judy Billing
Skanska
Rashleigh Weatherfoil
West
Byfleet
Surrey
KT14
6NG
M.O.D.
Main Building
Whitehall
SW1A
2EU
Internal
works, chiller plant room.
Sign
in at main entrance with requested I D.
To
access above areas using internal passenger lifts and stair wells, each
technician has LDN security pass. To be
escorted by a Skanska facilities engineer daily.
Use
gantry to access working level, aid climb carefully across pipe work
using material slings attached to lanyards from the working harness,
install rope protectors where necessary.
Ensure
power source has been turned off..
When
In position replace Siemens sensor fitted to flow header.
Remain
on site until system is tested and operational.
A
complete photographic data report can be provided on completion.
|

|
|
Graham
Handley (Project Manager)
AESA
UK Limited
104
Maltings Place
169
Tower Bridge Road
London
SE1
3LJ
Radissons
SAS
Hotel
London
Airport
Waltham
Close
Stansted
Airport
Essex
CM24
1PP
United
Kingdom
Naracon
Monorail Internal Trolley System
Using
industrial rope access equipment and advanced rigging systems connect a
GT operative to the internal perimeter person rider trolley rail.
Throughout
the project a second GT operative shall police ground level if requested
install
cordons and signage.
Carryout
a visual and textile examination to each bolted attachment point to
perimeter person rider bracket plate system installed. With works
carried out 2006 the continuity of the rider system fabrications has
shown a noticeable reduction in deflection.
Each
bracket has six bolted fixings, a total of 216 fixings were tested and 3
were tightened.
No
deflection was visible and end stops were in good order.
Naraco
External Box Ladder System
The
low level buffer rail has been drilled and fixed on every horizontal
providing continuity within the structure and will prevent any further
distortion damage.
All
works carried out at a methodical pace in awareness of person safety.
|

|
|
Craig
Blake / Barbara Baynes / Judy Billing
Skanska
Rashleigh Weatherfoil
West
Byfleet
Surrey
KT14
6NG
M.O.D.
Main Building
Whitehall
SW1A
2EU
Trace source of leak from
ladies toilet to external roof area. Inspect roof membrane and gutters.
If necessary release a colour dye to assess source of leak.
Carry
out remedial works using high quality materials supported with product
data sheets. All works guaranteed to products documentation.
|

|
|
John
Wicks / Paul Creasey
Chorus
Group Limited
Third
Floor
Finsbury
Tower
103
– 105 Bunhill Row
London
EC1Y
8LR
UK
Chorus,
fourth
floor,
75
Davies Street
,
London
W1.
Three
external elevations on second, third and fourth floors.
Remove
the adhesive label marks and dust clean 68 glazed window units. Install
beige sealants to brick work and grey to powder coated alloy window unit
surrounds. Apply grey sealants to existing lead work, a total of 68 window
units in three external elevations.
These
works are to be carried out using Industrial Rope Access complying with
the IRATA Guidelines, New Work at Height Regulations and relevant HSE
legislation.
To
create access the minimum requirement for anchorage is a connection that
can withstand a 6 kilo
Newton
direct load (BS 5485), hereafter this will be referred to as safe
anchorage.
Safe
anchorage will be made by using the existing roof cradle tracks and
certificated anchor bolts.
The
working ropes will be connected to bomb proof rigging strops by means of
a Karabiner with a minimum breaking load of 22Kn as per CE
EN362/EN12275. Each pair of working ropes will have two points of safe
anchorage,
The
working ropes will comprise of low stretch 10.5 or 11mm diameter
Kernmantle ropes in pairs and comply with CE EN1891 with a minimum safe
working load of 270kg and a breaking load of 2700kg.
The
abseilers will connect to the pair of working ropes through their
harness by means of ascending or descending devices, complying with CE
EN567, EN341. Once fully equipped they will step over the parapet wall
edge, then abseil to the workface. The working ropes can be deviated by
using material slings attached to the fitted roof hand rails creating
precise work positioning. A central haulage system will be used to feed
materials and equipment to the working technicians. The attendant ground
operative will provide this service; he can operate this rope from the
roof or ground.
The
Abseilers will be supervised by an IRATA Level 3 qualified supervisor.
The supervisor will communicate with the abseilers via two way radios.
If
there are structural members or jagged edges these will be protected
using rope protecting sleeves, reducing the damage to the ropes.
If
necessary additional anchorage points will be required, this will be
achieved by cables, slings or “cows tails” A cows tail being a short
length of dynamic rope complying with CE EN9892 which will be attached
to the harness at one end and in a karabiner at the other (Where
attached to the anchor point).
A
complete photographic data report can be provided on completion.
|
 |
|
Craig
Blake / Barbara Baynes / Judy Billing
Skanska
Rashleigh Weatherfoil
West
Byfleet
Surrey
KT14
6NG
M.O.D.
Main Building
Whitehall
SW1A
2EU
Mr
Gary S Ward now holds a LDN security pass which allows the access team
to be unescorted. Ensure each technician is constantly attached to the
certificated anchor bolts, or working ropes, install rope protectors
where necessary.
Re-lamp
all 32 external flood lamps.
All
tools and materials will be placed in GT lock neck material pod bags
whilst working at heights.
Egress
to all occupied rooms have been logistically planned prior to project
commencement by Skanska facilities management team.
To
maximize on productivity and minimize on any disruption to clients the
entire project will be policed at all times by each IRATA trained
technician.
GT
shall supply all certifications and insurances on request.
Exclusion
zones shall be installed on request using hazard signage and warning
tape if requested.
|

|
|
Graham
Handley (Project Manager)
AESA
UK Limited
104
Maltings Place
169
Tower Bridge Road
London
SE1
3LJ
Institute
Of
Cancer
Research
Paul
O’
Gorman
Building
Huntley Street
London
WC1
United
Kingdom
Using
industrial rope access equipment and advanced rigging systems connect a
Spanish specialist alloy welder to the internal perimeter person rider
trolley rail to enable repairs to the interlinking components.
Throughout
the project a second GT operative shall police ground level if requested
install
cordons and signage.
Carryout
a visual and textile examination of work undertaken.
GT ROPE ACCESS LIMITED and AESA UK LIMITED
have combined there skills and training to complete this project
successfully and safely.
GT
have supplied all certifications and insurances on request.
All
tools used shall be fastened to the working harness via lanyards.
Haulage
systems shall be installed and all material objects raised and lowered
using tailored slings.
GT
will contribute skills, equipment and experience to ensure the project
is completed safely and efficiently.
A
complete photographic data report can be provided on completion.
|

|
Simon Waring / Mark Crook
Shepherd Construction Ltd
Westminster House
31-37 Windsor Road
Slough
SL1 2EL
Burlington Danes Imaging Centre
Du Cane Road
London W12 0TY
External water proofing works to glazed link bridge between above
address and hospital
Install a temporary man safe system using advanced rope access rigging.
Fixed anchor bolts shall be load tested to 5Kn prior to project
commencement, on completion the anchors removed and holes filled with
brick mortar uniformed to brick façade.
When attached to man safe systems apply acrypol + roofing system to
external GRP roof.
|
 |
|
David Willmott / Contracts Manager
Jarvis Accommodation Limited
Meridian House
The Crescent
York
YO24 1AW
Provide detailed surveys and reports assisting with internal and
external access methods for the cleaning contract of Whittington
Hospital Highgate Hill London N19 5NF building.
|
|
|
NDM Lead Sheet Specialists
Paul Flynn
Metallum House
3 Innovation Park
Manor Farm Road
Middlesex
HA0 1XE
Project 240 Regent Street, London WC1
Installation of fall arrest netting on variouse roof elevations.
To supply and install 5mm diameter high tenacity polypropylene, 45mm
squared knotless mesh nets, with a 11mm kermantled rope perimeter. This
will be suspended from the steel beams with steel cable strops and
supporting steel cables (where necessary), at two metre intervals.
The netting is UV treated and does not absorb water, it also has a high
resistance to alkaline and acid. Note: Should the netting be subjected
to a dynamic fall, it must be replaced – the net tightens and the twine
become damaged.
The above work will be carried out using industrial rope access
complying with the IRATA guidelines, subsequent British standard and
relevant HSE legislation.
The costs below include all rigging and access equipment, skilled and
qualified labour, tools, rope access personal protective equipment, etc
to carry out a comprehensive completion of the work.
|
 |
|
Craig Blake / Barbara Baynes / Judy Billing
Skanska Rashleigh Weatherfoil
West Byfleet
Surrey
KT14 6NG
UK
M O D main building
Whitehall
SW1A 2EU
Internal atria works level eight spine 2 C Embankment side.
Create access to banner catenarie wires obstructing beam detectors,
deviate obstructing cable with five meter steel cable extension fitted
with pipe grips and adjustable barrel strainer.
Re-align beam detectors under the supervision of Andrew Apia, on
completion aid climb into house cradle and descend to allocated parking
zone.
|

|
|
Craig Blake / Barbara Baynes / Judy Billing
Skanska Rashleigh Weatherfoil
West Byfleet
Surrey
KT14 6NG
UK
M O D
Old War Office
Horseguards Avenue
Whitehall
London
SW1A 2EU
Main security entrance to court yard.
To access agreed areas using aid climbing techniques. Create a rope
access haulage system to raise Youngman’s decking boards and a six meter
alloy tower erected and supported by out rigging rope systems. The work
platform will ensure work positioning to replace, re-lamp and commission
overhead lighting and roof top flood lights.
SRW will supply an electrician to supervise the project, provide all
tools, materials and assist where necessary.
|
|
Mr Robert Lloyd
Doveguard Construction Limited
9-13 Cow Cross Street
Farringdon
London
EC1 6DR
UK
9-13 Cow Cross Street
Farringdon
London
EC1 6DR
UK
External Masonry and Timber Refurbishment Project Grade 2 Listed
Building
All Elevations
Restore all single timber sash window frames with twelve panes.
Power wash external brick reveals and stone window sill to remove dirt
and traffic film.
Remove and re point any loose or missing mortar joints.
Brickwork reveals to be coated with a water proof product.
Apply low modular sealant to the perimeter of each window frame to
brickwork junction.
Providing the timber is not rotten and repairs are not necessary the
unit shall be rubbed down using a cordless sander, a coat of primer and
coat of gloss applied (all paint applications shall adhere to the
product data sheets provided).
Below the horizontal pipe work / guttering install on a mortar bed and
install two stone air grills to uniform with existing brick façade.
Remove grey plastic ventilation pipes and re brick.
Replace missing brickwork and uniform mortar.
Remove lead flashing imbedded in brickwork over guttering head. |
Doveguard |
|
Skanska Build UK
M O D Head Office
Whitehall,
London
SW1A 2EU
The Old War Office
Whitehall
Maintenance of Line and Netting System
There are three Uni-line horizontal flexible permanent cable systems
which span the well area in order to provide access to inspect and
maintain the fall arrest netting.
There are also roller carts, attachment linkage and suspension lanyards
/ rope which must be held on site for use as part of this system.
Cableway Safety Systems
To inspect and test each cable way system by disassembling the toggle
swage ends and individually testing the bolts to the end anchors, and
then carrying out a safe working load test on the cable swage end of 15
KN as per the legislation. The total end loading capability will be
calculated and recorded on the system tag.
On completion of the test, each system will be marked and logged on our
paperwork; and a disc documenting the systems user number, safe-working
load, etc, will be secured to each individual system.
|
 |
|
Simon Waring / Mark Crook
Shepherd Construction Ltd
Westminster House
31-37 Windsor Road
Slough
SL1 2EL
Burlington Danes Imaging Centre
Du Cane Road
London
W12 0TY
Carryout advanced rigging to the internal atria cylinder steel work,
install four tram ways at height using fabric turfers, material chocked
slings and various descender devises. When safe access if installed the
four elevations can be re-lamped. Ground level must be policed and
cordened off displaying work at heights signage.
Carryout inspection, repairs and paint applications to South Facade
external steel work fabrications level six to level one. Using rope
access skills create access to all damaged paint work identified and
photographed and agreed with Simon Wearing of Shepherds Construction.
Repairs to be rubbed flat a base coat steel primer applied and a final
top coat applied, all applications to be of a high standard and
uniformed.
|
 |
|
Simon Waring / Mark Crook
Shepherd Construction Ltd
Westminster House
31-37 Windsor Road
Slough
SL1 2EL
Burlington Danes Imaging Centre
Du Cane Road
London
W12 0TY
Create rope access within internal atria main entrance, clean and
paint all horizontal cylinder steel beams. Project to be policed and
appropriate signage and barriers in place. All finished surfaces to be
protected with cortex and dust sheets. Paintwork to be completed to high
standard, supervised and inspected by Shepherds Construction Limited.
|
 |
|
Mr Pat O’ Conner
Stonewest Limited
Lamberts Place
St James road
Croydon
CR9 2HX
UK
14 Cornhill
London
EC1
UK
Various Elevations
Create access using advanced industrial rope access rigging from any two
structural points.
Install anchorage eye bolts if required, to deviate working ropes into
precise work positioning.
Rope protectors shall be installed to prevent friction to masonry or
metal edges.
Install corking and sealants to joints between stone clad pre cast
units, tool finish and uniform to remaining sealants.
|
 |
|
Mr Richard Bellamy
Bellfort Services Limited
79 Long Acre
Covent Garden
London
WC2 9NG
Holborn
Bloomsbury Square
W1
External Restoration of Masonry and Timber
Restore timber sash window frames.
Power wash external brick reveals and stone window sills to remove dirt
and traffic film.
Remove and re point any loose or missing mortar joints.
Concrete reveals to be coated with a water proof product.
Apply low modular sealant to the perimeter of each window frame to
brickwork junction.
Restore vertical cast iron drain pipes guttering and hoppers and
decorate with a base primer and a final gloss coat.
(All paint applications shall adhere to the product data sheets
provided).
Uniform works to a high standard.
|
 |
|
Craig Blake / Barbara Baynes / Judy Billing
Skanska Rashleigh Weatherfoil
West Byfleet
Surrey
KT14 6NG
UK
M O D main building
Whitehall
London
SW1A 2EU
External Spine Two Section C Lamp 16 Embankment Side.
Construct a rope access latch way system to allow safe access onto the
parapet ledge.
Ensure external flood lamps are disconnected from power source, remove
bracket and lamp and re-fit new replacement unit. Test new installation
under the supervision of a SRW engineer.
|
 |
|
Allanna Anne Flat / Managing Director
Innovation Property Services Limited
54 Marmion Close
Chingford
London
E4 8EW
UK
Project
Excel Building 1
Western Avenue
Royal Victoria Dock
London E16 1XL
Roof Top West and East Elevations.
Commission EXCEL illuminated signage.
Create a temporary rope access latch way system to access work zones.
When positioned at the zone ensure each rope technician is constantly
attached to two structural points via material slings and lanyards
fitted to the working harness.
Remove and refit each external lamp access panel using zinc plated
self-tap screws supplied by IPS Limited. Each panel shall have a minimum
of four secure fixings.
A CCJ is in the process of being issued to I P S Limited
|
|
|
Allana Anne Flatt / Director
Innovation Property Services Limited
54 Marmion Close
Chingford
London
E4 8EW
UK
Excel Building
1 Western Avenue
Royal Victoria Dock
London
E16 1XL
Re Lamp Four Aircraft Warning Light.
Install a temporary rope access latch way system to allow safe access to
the work zone.
Aid climb each thirty meter tall steel cylinder spansion and re-lamp
with ES100 lamps.
A CCJ is in the process of being issued to I P S Limited |
|
|
Graham Handley (Project Manager)
AESA UK Limited
104 Maltings Place
169 Tower Bridge Road
London
SE1 3LJ
Radisson SAS Hotel
Stansted Airport
United Kingdom
Using industrial rope access equipment and advanced rigging systems
carryout load tests to wine tower winches systems, in house person rider
systems and external ladder system.
NOTE –
Internal perimeter rider system tested with 320 KG
Wine tower winches tested with 240KG
External access ladder system tested with 340 KG
|

|
|
Allana Anne Flatt / Director
Innovation Property Services Limited
54 Marmion Close
Chingford
London
E4 8EW
UK
Excel Building
1 Western Avenue Royal Victoria Dock
London
E16 1XL
Roof Top West Elevation EXCEL sign.
Remove and re lamp each florescent lamp within the external EXCEL
signage.
Clear all foliage and debris from each open unit and secure access
covers.
A CCJ is in the process of being issued to I P S Limited
|
|
|
Craig Blake / Barbara Baynes / Judy Billing
Skanska Rashleigh Weatherfoil
West Byfleet
Surrey
KT14 6NG
UK
M O D main building
Whitehall
SW1A 2EU
Level Ten External Spine One Gulleys
Level Ten External Spine Three Section C Embankment Side Gulleys.
Clear gulleys above the leak report locations using industrial rope
access.
|

|
|
Simon Waring / Mark
Crook
Shepherd Construction Ltd
Westminster House
31-37 Windsor Road
Slough
SL1 2EL
Burlington Danes Imaging Centre
Du Cane Road
London
W12 0TY
Internal painting applications works to main entrance mode steel
works.
|
 |
|
Lee Barnes
8 Build Limited
8 Token House Yard
London
EC2R 7AS
Society General Building
41 Tower Hill
London
EC3 4SG
Create a weatherproof seal between building faced and external air
conditioning flumes using sealants and flash band.
|
 |
|
Frank Tewes
The Rezidor Hotel Group S.A
Avenue du Bourget 44
B-1130 Brussels
Belgium
Park Inn Hotel
St Marys Street
Bedford
Bedfordshire
MK42 0AR
United Kingdom
External renovations to front, rear, Duck Mill Lane and Riverside
Elevations.
Provide a quotation to repair concrete external panels and install
sealants.
Reviewing the concrete inspection summary and its findings it is
possible to create a programmed system of remedial works.
• Manually cut out and remove the weathered sealant and foam backing
strips
• Damaged horizontal and vertical joints to be reformed using a
proprietary repair material
• Where spalling is evident the reinforcement bars will be exposed by at
least 25mm of all corrosion, needle gunned back to bright using a hilti
104 percussion chisel, treated with a corrosion proof coating and the
surrounding area plugged and reformed with a BBA approved proprietary
two part system cementations repair material called Rona bond HB40
mortar mix and HB40 primer.
• The BAA approved Rona bond repair product is supported with an
insurance backed guarantee.
• Plugs which cover pre-cast panel anchor points are generally loose or
missing as noted these need to be replaced.
• The top roof has a stone chip render coating which been hammer tested
to expose extreme movement and cracking, repairs will be made and
catalogued.
• All repaired concrete panels to be coated with PVA concrete slurry and
uniformed with the existing façade.
• Install and recess new Arbo 30mm diameter foam packing strips between
each panel
• Apply Arbo 2650 primer to concrete joints ensure surface is dry and
dust free allow 24 hours to dry before installing sealants
• Gun Arbosil11090 neutral cure low modular colour black sealants 10mm
deep, tool finish and uniform throughout
• Arbosil 1090 is the recommended sealant for use with concrete panels
it provides more movement and life span than Arbosil LM
• Pre-cast panel joints vary from 12mm to 35mm
• The average joint width shall be assumed to be 20mm wide
• A 380ml sealant cartridge will cover 1.7 metres gunned 10mm deep beads
• A list of quality products will be provided supported with
manufacturer’s data sheets, explaining application details and COSHH
requirements.
• All refurbishment work will be guaranteed with reference to the
material data.
|

|
|
Alan Gredley / Construction Manager
Mike Evans / Financial Manager
8 Build Limited
8 Token House Yard
London
EC2R 7AS
39-40 Botolph Lane
London
EC3R 8DE
North Elevation to Botolph Alley and West Elevation to Botolph Lane.
Level one to six.
External Renovation works to masonry, lead dormers, casement windows,
box guttering, fascias and carry out a complete build clean.
|
 |
|
Phil Rubery
Omega Red Group Limited
Unit 10 Prospect Way
Hutton Industrial Estate
Brentwood
Essex
CM13 1XA
UK
Project
44–48 Brook Street
London W1 to corner of Davis Street W1
Set up advanced rigging systems for GT technicians to access all the
agreed installation areas.
Install lightning tapes as advised by an on site Omega Supervisor.
|

|
|
Cliff Logan / Venue &
Estates Services Manager
Annette Mc Kenzie /
Building Service Coordinator
Excel London
One Western Gateway
Royal Victoria Dock
London
E16 1XL
UK
Project:-
Excel London
One Western Gateway
Royal Victoria Dock
London
E16 1XL
Supply four
complete fall arrest harnesses, PPE packages and carry out a working at
heights briefing, high light danger zones and fall factors.
Set up advanced
rigging systems where latch way systems are not installed and escort Sir
Robert Mc Alpine clients to the required zones at roof top.
|
 |
|
Jim Kitson / Senior Project
Manager
Current Development Limited
Interior Services Group PLC
Aldgate House
33 Aldgate High Street
London
EC3N 1AG
UK
Project:-
32 Duke Court
London
SW1
Remove redundant
air conditioning pipe work and brackets from roof top.
|
 |
|
Stephen Jevons / Managing
Surveyor
Morgan Lovell PLC
16 Noel Street
London
W1F 8DA
UK
Project:-
210 New Kings
Road
Putney
London
SW6 4NZ
All elevations
eight level building
Install sealant
applications to window heads creating a weather proof seal.
|

|
Darren Bone /
Contracts Co-ordinator
Environmental Management Solutions Services Limited
Global House
Geddings Road
Hoddesdon
Hertfordshire
EN11 0NT
Project:-
Crystal Palace National Sports Centre
Ledrington Road
London
SE19 2BB
ASBESTOS REMAL
North and South internal supply ducts
Duct work dimensions 23 metres high, 3 metres wide and 1.2 metres depth.
Structural rigging points at internal roof level descending to sub
basement / mezzanine level.
• EMS Group limited to provide responsible personnel operatives to
assist throughout this project.
• GT Rope Access technicians to receive full asbestos ARCA training
provided by EMS Group limited.
• All provisions to be in place to protect everyone against risks to
health or safety arising from activities at work; and submit proposals
for new or revised regulations and approved codes of practice
• Project to adhere to HSE, HSC, Statutory Instrument 2006 No. 2739 The
Control of Asbestos Regulations 2006, L.O.L.E.R. and I.R.A.T.A.
regulations
• All tools, materials and equipment to be supplied by EMS Group Ltd.
• On completion all rope access equipment to be removed and disposed of.
New harnesses, ropes, slings, cow tails, lanyards, rope protectors, pod
bags and PPE to be replaced by EMS Group Ltd.
• Removable task lighting to be in place within each shaft.
• For each duct rigg two sets of working ropes from structural steel
work within internal roof.
• Install rope protectors and roller plates to reduce any friction and
damage to working ropes and climbing equipment.
• Install an additional haulage line to enable the vacuum system to be
lowered within each shaft. This system will be operated by G T Rope
Access technician based at the entrance point of each duct and using two
way radios communicating with the two rope technicians.
• Should a final internal inspection be required by EMS Group the G T
Rope Access team can provide a half day training program and escort that
person in a controlled decent through each or all shafts..
• A complete photographic data report can be provided on completion.
• Any additional works can be added as variations and carried out as
agreed upon. |
 |
|
|
|
|
Interior Services Group PLC
John Bray / Project Director
Terry Byatt / On Site Contact
Aldgate House
33 Aldgate High Street
London
EC3N 1AG
UK
Project:-
14 Cornhill, London, EC1 UK.
Carryout sealant applications, re-point stonework and remove blockage
to box section guttering using pipe extensions and a wet vacuum.
|
 |
|
Pat
Coffey
Advance Cleaning
Services Limited
39 Gorse Ride North
Finchamstead
Wokingham
Berkshire
RG40 4ES
Hire out four one
ton elephant push travel trolleys to assist in an internal atria clean.
Terms and
conditions apply as agreed.
|
 |
|
Mr Giovanni Florentino / Property Owner /
Building Developer
Waterman’s Quay
William Morris Way
London
SW6
Project at the above address
Commission a purpose built glass atria suspended over the River
Thames on the ninth floor
Brief program of work
1. Using cordless hand tools remove / inspect alloy capping plates and
pressure plates
2. Label each item and place in suitable temporary storage
3. Rake out existing sealants
4. Glass unit to remain in place
5. Conservatory frame work surfaces and glass shall be cleaned and new
sealants applied as stated in Arbo product data sheet any variations
arbo technical department shall advise
6. Pressure cover plates and external cappings shall be re-fitted
7. A final inspection and water test shall be carried out
8. Prior to completion a professional external glass clean shall be
provided
9. Equipment to be de-rigged and removed
10. A temporary weatherproof shield will be provided and installed
should we incur any unforeseen weather conditions during the above
procedure
11. Works may have to be re scheduled due to weather conditions or
breakages
|
|
|
Patrick Fairman
Omega Red Group Limited
Unit 10 Prospect Way
Hutton Industrial Estate
Brentwood
Essex
CM13 1XA
UK
Project
The Exchange
Charles Street
Croydon
Surrey
Assemble portable alloy roof riggs on roof top to access and install
all lightning tapes to ground level.
|
 |
|
Cliff Logan / Venue & Estates Services Manager
Annette Mc Kenzie / Building Service Coordinator
Excel London
One Western Gateway
Royal Victoria Dock
London
E16 1XL
UK
Project
Excel London
One Western Gateway
Royal Victoria Dock
London
E16 1XL
Provide working at heights training for a minimum of four men and a
maximum of eight venue engineers.
• supply fall arrest harnesses
• suitability of equipment
• inspection of PPE
• fall factors
• fall arrest
• work-restraint
• work positioning
• practical usage of on-site specific system
• personalised certification and work manuals issued on completion
|
 |
|
Charles Cooper
Eye Pro Limited
Hollywood House
76 Hollywood Lane
Rochester
Kent
ME3 8AR
Project
Carisbrooke Court
63-65 Weymouth Street
London
W1
All elevations as schedule of works
Create and connect to latch way systems before accessing roof top.
Set up advanced rigging and pulley systems for GT technicians.
Create access with the use of three alloy roof riggs each backed up to
tested anchor bolts.
Carryout masonry, timber and lead restoration.
|

|
|
Interior Services Group PLC
John Bray / Project Director
Steve Baker/ On Site Tech Services Manager
Aldgate House
33 Aldgate High Street
London
EC3N 1AG
UK
Payment to be made by;
Accounts Kalpesh Patel
J.Coffey Construction Limited,
93 – 95 Greenford Road Harrow
Middlesex
HA1 3QF
Project
One Finsbury Circus London EC1 UK.
Install electrical systems to operate internal riser louvers. Levels 1 -
8.
Assisted by
• James Cooke of Mitie Engineering Services Limited
• Ben of HSC Candela Limited
|


 |
|
|
|
|
Back
to Top
|
|